Engineering, Procurement & Construction

  • Client: Altagas

    Location: Prince Rupert, BC

    • Electrical, Controls and Instrumentation (EIC) Construction and Commissioning Management for $ 600 Million Propane Export Facility

  • Client: Gowlland Island

    Location: Gowlland Island, BC

    • EPC project involving detailed design and IFC drawings for the replacement of the 15kV submarine cable and the upgrade of the electrical system on Gowlland Island-BC. Also provisioning of all required technical documents for the BC Hydro application.

Previous
Previous

Control Systems

Next
Next

Custom Solutions